City of St. Albert Lateral Contract 2016.
Completed various locations installing 3 T-liners® in lined mains, and installing 4 lateral cleanout shots to unlined mains, the work also included an emergency 300mm storm spot repair on St. Anne street, that composed night work, traffic accommodation, and noise permits, all work completed in one week.
County of Strathcona 2016
Completed CIPP of 10 laterals, and 2 T-Liners®, for the County of Strathcona,
City of Leduc/Insituform Technologies mains and laterals 2016 | M.J.K. Alberta Ltd.
Contract awarded to Insituform, for main and lateral work, we were in charge of lateral portion of contract we installed laterals for this project, including 10 t-Liners® and 16 Lateral Cleanout shots, also had to install external cleanouts in some locations to allow installations due to insufficient working space, 3 locations required open cuts that we completed due to collapsing no corrode pipe.
Fort Saskatchewan 2016 | M.J.K. Alberta Ltd.
Completed CIPP of 27 laterals for the City of Fort Saskatchewan,
Town of Mayerthorpe 2016 | M.J.K. Alberta Ltd.
Installation of 2 laterals, by means of air inversion, liners were installed to repair a 60% offset that existed in the sewer line where the town had installed a water line, the PVC repaired section of pipe had settled down creating the bad offset, we had to use high pressure and volume of water to flush out broken pieces of mineral deposits, once clean 4” liners were installed using LMK Technologies LLC Performance Liner ® and Insignia Gaskets® to prevent infiltration and exfiltration at the joints that were damaged. liners were installed successfully and main street did not have to get excavated.
City of Edmonton 2016 | M.J.K. Alberta Ltd.
Worked with City of Edmonton Drainage, and relined 13 laterals, with each project liners were installed with homeowner, liners included 4”-6” Transitions, Liner sizes ranged from 6”X105’ to 4”X85’ Long.
Homestead Housing Cooperative 2016 | M.J.K. Alberta Ltd.
CCTV all sanitary and storm sewer network, mapped out all sewer lines and inverts, reported to management company Casa Housing all defected pipe, made repairs using some trenching technics, were sags were present, or where there were severe offset joints, as well as removing a snake cable that was stuck under the slab of 4 of the units, all excavation areas were restored, and prepared for new pavement, sidewalks were replaced as needed. once all excavations were completed we installed: 1-Storm CIPP 6”X34 meters to repair a cracked storm line from CB-STMMH, 2-Sanitary CIPP 6”X34 meters long process required notifying residence of work and bypass to ensure process would not cause any backup issues. Once repairs were made, all areas were CCTV’d and provided to the Management company, and a maintenance schedule was created with Casa Housing Corp.
CAPITAL REGION HOUSING CORPORATION 2015 | M.J.K. Alberta Ltd.
Awarded job to install 120meters of 300mm storm, 3 catch basins, storm manhole and tie to existing, work was completed in November to December, area had only 73” of working space in some locations to excavate the 300mm storm line in place, work was completed on time and on budget.
Keegano Housing Cooperative 2015 | M.J.K. Alberta Ltd.
M.J.K. Alberta Ltd, was hired to CCTV and Snake 51 laterals on site as part of a maintenance program that was developed by M.J.K. Alberta Ltd. in 2014.
ESL Environmental 2013-2015 | M.J.K. Alberta Ltd.
Repaired 15 locations on asbestosis water line in neighborhood, including 10 water valves, and 4 Hydrant replacements, roles: Hydrovac, repair, and backfill problematic water line or condition, landscape area to match existing landscape.